Customization: | Available |
---|---|
After-sales Service: | Has |
Warranty: | One Year or 30000km Which Comes First |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
tem Parameters |
Parameters |
others |
|||
1 |
Water tank capacity |
water |
3000 |
Built-in type |
|
|
Foam tank capacity |
foam |
2000 |
||
2 |
Fire pump model |
CB20·10/30·60 |
Shanghai rongshen |
||
3 |
Fire pump performance |
condition |
Pressure1:1.0Mpa flow:60L/S |
Use vacuum pump to priming water |
|
4 |
the installation site of fire pump |
rear |
|
||
5 |
The quantity of fire pump water outlet |
6 |
|
||
6 |
Pressure gauge |
0-1.6 Mpa, 0-2.5 MPa |
2.6 level |
||
7 |
Vacuum gauge |
-0.1- -1 MPa |
2.6 level |
||
8 |
Water monitor |
water |
Flow: |
Range:60m |
Shandong zhangqiu |
foam |
Range:55m |
||||
Depression/Elevation angle |
-30-+70° |
||||
Turning angle 360° |
|||||
9 |
PTO Model |
YTQ590K type full power sandwich , pneumatic |
|
Special function description |
1. Overall layout The whole vehicle is composed of two parts: the fireman crew room and the body. The body layout adopts the overall frame structure, the inner water tank, both sides are the equipment box, the rear is the water pump room, and the tank is the parallel rectangular box tank. 2. Equipment box and pump room The main frame structure of the structure is made of high quality square pipe welding, the outer decorative plate is welded with carbon steel plate, the roof is anti-skid, walking, the flip pedal is set on both sides, anti-skid design. Equipment box The equipment box is located in the back of the passenger room, with aluminum alloy rolling shutter doors on both sides and lights. Equipment box room shall set up a storage box according to the demand. Pump room The pump room is located in the rear of the vehicle, on both sides and behind, and there are lights inside. Some common equipment can be placed on both sides of the pump room 3. Climbing the ladder and get on the car The rear ladder is made of aluminum alloy, which is not more than 350mm from the ground. The surface is rounded steel pipe, and the surface is sprayed with plastic treatment. 4. Water tank Material of high quality carbon steel, thickness of 4mm (can be made of stainless steel and PP material according to user requirements) The tank body fixation is elastically attached to the chassis frame Manhole: 1 DN460 manhole with quick locking / opening device Overflow port: 1 DN65 overflow port Waste water outlet: 1 DN40 water tank, with ball valve Water injection port: 1 DN65 interface on the left and right side of the water tank Intake and outlet: 1 water tank to water pump inlet pipe, DN100 valve, pneumatic, manual control, 1 water pump to water tank filling pipe, DN50 valve, pneumatic and manual control 5. Foam tank Material of high quality carbon steel, thickness of 4mm (can be made of stainless steel and PP material according to user requirements) The tank body fixation is elastically attached to the chassis frame Manhole: 1 DN460 manhole, with quick locking / opening and automatic pressure relief device Overflow port: 1 DN40 overflow port Residual liquid port: 1 DN40 foam tank Foam outlet: set up 1 DN40 foam tank to the water pump outlet foam pipe 8. Pipe system Pipe material is made of high-quality seamless steel pipe A DN125 suction port is set on the rear side of the pump room One DN65 water injection outlet is set on the left and right sides of the water filling tank, and one DN40 pump is set in the pump room for water filling pipe into the tank One DN65 and one DN80 water outlet on the left and right sides of the pump room, with stop valve and cover cover The cooling water line is equipped with the cooling water line and the control valve for the cooling force collector 9. Fire control control system The control panel mainly includes two parts: cab control and pump room control Control control pump disgear, alarm, lighting and signal device control The pump room control is equipped with the main power switch, parameter display and status display 10. Electrical equipment Additional electrical equipment shall set up an independent circuit Auxiliary lighting firefighters room, water pump room and equipment box respectively equipped with lighting, control the instrument panel with lighting, indicator lights on both sides of the red and blue strobe, warning device long row all red lights, installed on the top of the cab, the alarm, the control box in front of the driver, fire lighting installation rear 35W fire searchlight 1 11. Equipment layout 1 According to the fire combat needs, according to the fire operation procedures, take and put nearby. 2 Use anti-corrosion, anti-vibration, anti-shedding, anti-scratch special fixture fixed. 3 Eye-catching signs, multiple people operation, non-interference with each other. |
Q1: I want the front two tires are bias tires and the rear 9 tires are radial tires, is it ok ? |
A: We can make the tires as your requirement to suit your country's need. |
Q2: What about your products quality ? |
A: Quality is our culture! "Our factory has advanced production technology and management team! We always attach great importance to quality controlling from the very beginning! |
Q 3: Can i have samples of this type of flatbed semi trailer to test the quality ? |
A: Yes, you can buy any samples to test the quality,our MOQ is 1 unit. |
Q 4: What others we can do ? |
A: According to your order, we will provide the best price and quality trucks and trailers. And we are well capable in offering overseas after-sales service. Besides, we also provide rational packing and shipping program,let shipment save money and security. |
Q 5: How to guarantee customers get the goods smoothly after they pay ? |
A: Don't worry, dear. We have been in this field for 10 years, we will send you production photos once in a while, and we will help you to book the latest ship. |
Q 6: What's the delivery time ? |
A: The delivery time is within 15 working days after receiving your advance payment. |
Q 7: Can you supply some quick-wear truck or semi trailer parts ? |
A: Yes, we can supply truck and semi trailer parts as your request,such as oil filter, fuel filter, air filter, traction, traction pin, balance beam and semi-trailer plate spring, hanging accessories, turntable, all kinds of trailer brake pads, brake pan, bearings etc. |
Q 8: Do you have any used truck and semi trailer for sale ? |
A: We have some trucks and trailers in stock for choice, from 2010-2016 year, the price are favorable. We'll show you our stock if you need. |
Q 9: Which INCOTERMS 2010 TERMS can we work ? |
MAOWO is a professional and sophisticated international player, can handle all INCOTERMS 2010 terms, and we normally work on FOB, CFR, CIF, CIP, EXW. |
Q 10: What logistics ways we can work for shipment? |
A: We can ship construction machinery by various transportation tools. (1) For 80% of our shipment, we will go by sea, to all main continents such as South America, Middle East, Africa, Oceania etc. Either by container or RoRo/Bulk shipment. (2) For neighborhood countries of China, such as Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.,we can ship construction machinery by road or railway. (3) For light spare parts in urgent demand, we can ship it by international courier service, such as DHL, TNT, UPS, or Fedex. |